Working Space & Dedicated Electrical Space According to NFPA 70 (NEC)

Spaces about Electrical Equipment
There are two categories of spaces about electrical equipment:
Working Space & Dedicated Electrical Space According to NFPA 70 (NEC)
1- Dedicated Electrical Space, this term applies to the space reserved for future access to electrical equipment and to protection of the equipment from intrusion by nonelectrical equipment.
2- Working Space, this term applies to the protection of the worker. So, Access and working space shall be provided and maintained about electrical equipment to permit ready and safe operation and maintenance of such equipment.
HOW TO DETERMINE THE DEDICATED ELECTRICAL SPACE OF ELECTRICAL EQUIPMENT?
The space equal to the width and depth of the equipment and extending from the floor to a height of 1.8 m above the equipment or to the structural ceiling, whichever is lower.
Note that: Dedicated Electrical Space shall be dedicated to the electrical installation, no piping, ducts, leak protection apparatus, or other equipment foreign to the electrical installation shall be located in this zone.
To know more about installation of sprinklers and sprinkler piping in electrical rooms, please visit the link below:Installation of Sprinklers in Electrical Rooms
HOW TO DETERMINE THE WORKING SPACE OF ELECTRICAL EQUIPMENT OPERATING AT 1000 VOLTS, NOMINAL, OR LESS TO GROUND?
These equipments require examination, adjustment, servicing, or maintenance while energized. So, working space shall comply with the dimensions of the followings:
(1) DEPTH OF WORKING SPACE.
The depth of the working space in the direction of live parts shall not be less than that specified in the following table:
Working Space & Dedicated Electrical Space According to NFPA 70 (NEC)
Working Space & Dedicated Electrical Space According to NFPA 70 (NEC)
Note that: Distances shall be measured from the exposed live parts or from the enclosure or opening if the live parts are enclosed.
Note that: The depth of the working space in the direction of live parts could be less than the values mentioned in the above table if any of the followings cases exist:
(a) Dead-Front Assemblies: Working space shall not be required in the back or sides of assemblies, such as dead-front switchboards, switchgear, or motor control centers, where all connections and all renewable or adjustable parts, such as fuses or switches, are accessible from locations other than the back or sides.
Where rear access is required to work on nonelectrical parts on the back of enclosed equipment, a minimum horizontal working space of (762 mm) shall be provided.
(b) Low Voltage: By special permission, smaller working spaces shall be permitted where all exposed live parts operate at not greater than 30 volts rms, 42 volts peak, or 60 volts dc.
(c) Existing Buildings: In existing buildings where electrical equipment is being replaced, Condition 2 working clearance shall be permitted between dead-front switchboards, switchgear, panelboards, or motor control centers located across the aisle from each other where conditions of maintenance and supervision ensure that written procedures have been adopted to prohibit equipment on both sides of the aisle from being open at the same time and qualified persons who are authorized will service the installation.
(2) WIDTH OF WORKING SPACE.
The width of the working space in front of the electrical equipment shall be the width of the equipment or 762 mm, whichever is greater. In all cases, the work space shall permit at least a 90 degree opening of equipment doors or hinged panels.
(3) HEIGHT OF WORKING SPACE.
The work space shall be clear and extend from the grade, floor, or platform to a height of 2.0 m or the height of the equipment, whichever is greater.
Within the height requirements of this section, other equipment that is associated with the electrical installation and is located above or below the electrical equipment shall be permitted to extend not more than 150 mm beyond the front of the electrical equipment.
Exception No. 1: In existing dwelling units, service equipment or panelboards that do not exceed 200 amperes shall be permitted in spaces where the height of the working space is less than 2 m.
Exception No. 2: Meters that are installed in meter sockets shall be permitted to extend beyond the other equipment. The meter socket shall be required to follow the rules of this section.
Exception No. 3: Where top terminal batteries are installed on tiered racks or on shelves of battery cabinets, working space in accordance with the battery manufacturer’s instructions shall be provided between the highest point on a cell and the row, shelf, or ceiling above that point.

মন্তব্যসমূহ

এই ব্লগটি থেকে জনপ্রিয় পোস্টগুলি

WHAT IS FIRE RATED GYPSUM DRYWALL?

Gypsum is approximately 21 percent by weight chemically combined water which greatly contributes to its effectiveness as a fire resistive barrier. When gypsum drywall is exposed to fire, the water is slowly released as steam, effectively retarding heat transmission. Fire rated gypsum drywall is more fire resistant because it contains glass fiber reinforcement and other additives within its specially formulated gypsum core to help it hold up longer to a fire exposure. Fire  rated drywall is referred to as “Type X” and must be third-party certified by an independent testing and listing agency such as UL (Underwriters Laboratories Inc.) and ULC (Underwriters’ Laboratories of Canada) to meet the fire performance requirements prescribed in the ASTM C1396 (CAN/CSA-A82.27) Standard Specification for Gypsum Board. Types of Fire Rated Gypsum: Type X fire rated gypsum drywall that is 5/8 -inch (15.9mm) thick and installed on each side of nominal 2-inch x 4-inch (38x89mm) wood

Pipe Schedule Method for Firefighting Sprinkler System

Pipe Schedule Method for Firefighting Sprinkler System                                     Pipe Schedule Method for Firefighting Sprinkler System  The water demand for firefighting sprinkler systems shall be determined by either the pipe schedule method or the hydraulic calculation method, in this article we will discuss the pipe schedule method. What is pipe schedule system?! According to NFPA 13, Pipe Schedule System is defined as sprinkler system in which the pipe sizing is selected from a schedule that is determined by the occupancy classification and in which a given number of sprinklers are allowed to be supplied from specific sizes of pipe. Where can we use pipe schedule method?! New systems of 465 m2 or less. Additions or modifications to existing pipe schedule systems. Classification of occupancies according to hazard NFPA 13 classifies the occupancies according to the quantity and combustibility of contents, the expected rates of heat rel

Method Statement for Installation of Fire Fighting Pipes and Fittings

1. SCOPE & PURPOSE 1.1 This “Method Statement” covers the nature and type of work for the Installation of Fire Fighting Pipes and fitting with Accessories and frequency at which the inspections are to be carried out. 1.2 This method statement gives guidelines contained herein so as to ensure that the job execution complies with the requirement of the specification and the authorities concerned and serves the intended purpose to satisfactory level. 1.3 This procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. 2. REFERENCES & RELATED DOCUMENTS: 2.1 Project Quality Plan – PQP 2.2 Quality Control Plan – QCP 2.3 Specification Sec 2.4 Approved MAR 2.5 Approved Shop Drawings. 2.6 Manufacturer Product Data Sheets 2.7 Manufacturer Installation Recommendations 3 ABBREVIATIONS: 3.1 Ref. Quality Control Plan 4 RESPONSIBILITIES: 4.1 Ref. Quality Control